www.townofdyer.com    Home  |   Contact Us  Login 
   Town of Dyer, Indiana
   
LocationHistoryMeetings & ActivitiesKeep Dyer Working 
Projects

 

  
Project Detail

Central Park drainage project Sept. 2010

Start Date: 9/8/2010 Complete Date: 11/15/2010 Responsible: Park Board

Full Description
Attached are three documents. One is the overall park site plan as of September 2010, the second is the proposed site plan with the drainage project shown and the third is a profile of the swale along the east end of the park property.

Summary
The Park Board has awarded the contract for the Central Park drainage project to the local firm of Dyer Construction. This project will only include the construction of a swale on the east and north ends of the Central Park property. The swale will act as the detention area for the park as well as the conduit to move storm water from the park into the Town of Dyer storm water system. The swale will be built with a 12" under drain in an effort to keep standing water in the swale during dry times.

Projected Cost
9/8/2010 8:00:00 AM

Attached Documents

Central Park swale profileView/Download
Central Park existing site planView/Download
Central Park site plan with swale improvementView/Download